1. Personnel: Show Your Maths, Name Your Roles, Link to the Workplan
Personnel is the first line item assessors check - and the easiest place to fail. A mismatch of 0.25 FTE in your budget table against 0.33 FTE in your workplan isn't a rounding error. To reviewers, it's immediate proof you haven't planned. Rejection follows.
You need three things in every personnel line: a named role, a salary basis, and a clear calculation.
Name the role, never the generic
"Project Coordinator" is fine. "Staff" is useless. State the role title and its level under the relevant award or pay scale. For Australian health or community grants: "Project Coordinator (SCHADS Award 2023, Band 4, spinal point 2)". For US federal grants: "Data Analyst (GS-11, Step 3)". Your funder can verify this instantly.
Show your maths in full
Don't write "$98,500". Write: "0.5 FTE × $98,500 annual salary (SCHADS Band 4) × 24 months = $197,000". Then add one sentence linking the role to specific workplan activities: "This position coordinates workshop scheduling, artist stipend processing, and evaluation data entry (see Workplan §3.2)."
Flag expensive staff early
If personnel costs exceed 75% of your total budget, address it directly. Explain why the project requires senior clinical or technical staff - for example, a health trial needs specialist nurses, not general project officers. Don't leave the reviewer guessing.
Check your 0.25 FTE against the workplan before you submit. If you find a mismatch, fix it - or justify it in writing. Assessors notice.
Checklist - Before you submit, verify:
- Every named role links to a specific activity in the workplan (section & activity number)
- Salary basis matches a published award/scale (SCHADS, GS-level, spinal point)
- Calculation is shown as a full formula (FTE × base × months = total)
- If personnel > 75% of budget, a brief justification is included
- Budget table FTE numbers match workplan FTE numbers exactly
2. Supplies and Equipment: Replace ‘Miscellaneous’ with Itemised Quotes
Write Supplies and Equipment: Replace ‘Miscellaneous’ with Itemised Quotes section here
3. Travel and Subsistence: Break Down Itineraries, Justify Necessity
Travel is the line item that gets the most aggressive scrutiny for the least actual money spent. If travel eats up more than 10% of your budget and you haven't provided per-diem breakdowns or an itinerary, you've just handed assessors a reason to pause. OpenGrants flags this as a top red flag - and it's entirely avoidable.
Build Each Trip Like a Line Item Audit
Every trip needs its own mini-justification. Don't bundle "travel" as one lump sum. Break it down:
- Airfare: State the quoted fare, carrier, and route (e.g., "Qantas, SYD-LAX return: $1,850 per person, booked 21 days in advance to secure economy saver rate").
- Accommodation: Name the rate and source (e.g., "$220/night × 4 nights at hotel within 0.5 km of conference venue, per federal per-diem rates").
- Per-diem: Show the daily allowance for meals and incidentals, referencing your funder's published rates or the latest GSAGSA scale.
- Registration: State the fee - or note it's waived (e.g., "Registration: $0 - invited speaker, host covers costs").
Then Answer: Why Does This Trip Belong in This Grant?
Every trip must connect directly to a named project component. You aren't attending a conference for networking - you're attending to present Component 4's pilot findings (dissemination), or to complete a training module required by Objective 2. State the component number, the outcome it supports, and the justification for in-person over virtual attendance.
Top tip: Three people to one event needs a rationale. "Data and Dissemination Lead plus two youth co-researchers attend for capacity-building" - that works. "Because we can" - that doesn't.
Checklist: Before You Submit
- Each trip itemised as airfare, accommodation, per-diem, registration
- Sourced per-diem rates or funder-specific travel policy cited
- Link between trip and specific project component (e.g., "Supports Objective 4 dissemination") stated
- Group travel (multiple attendees to same event) justified by role or purpose
- If using own car: fuel rate ($/km), estimated distance, and parking/tolls itemised
- International travel justified with explanation of why domestic alternative won't work
4. Consultant and Subcontractor Fees: Benchmark Rates, State Deliverables
Flat consultant line: Consultants: £10,000. That’s not a justification - it’s a placeholder. Assessors will flag it immediately. They need to see three things: the rate, the deliverable, and the benchmark you used.
Link Every Pound to a Tangible Output
Name the consultant, spell out the specific deliverable, and state the hours.
Strong example: “Freelance UX designer (Jane Doe): £125/hr × 80 hours = £10,000. Deliverable: accessible wireframes and usability test report for digital platform (Objective 2, Phase 1) by Month 8.”
Weak example: “Consultant services: £10,000.” Zero credibility.
Benchmark the Rate - Don’t Guess
Funders check rates against industry standards. For UK health grants, benchmark against relevant salary scales or the Executive Level IV equivalent (~£680/day). If your consultant’s daily rate exceeds this, justify it (e.g., specialist niche, short-term engagement with no indirect costs).
Checklist:
- Hourly or daily rate stated clearly.
- Rate benchmarked against a named survey or salary scale.
- If above benchmark, a one-sentence justification.
Subcontractor vs. Consultant - Know the Difference
A subcontractor works under your organisation’s direction, uses your equipment, and you manage their output - their costs can include indirect costs (overhead, facilities, admin). A true consultant provides expert advice or a defined service independently - you pay a flat fee or hourly rate with no indirect costs added. Misclassifying one as the other triggers a compliance flag.
Bottom line: Name the person, name the output, show the maths, state the rate source. If you can’t explain the figure in two sentences, assessors won’t trust it.
5. Indirect Costs, Contingency, and the Final Cross-Check
Contingency: Not Optional, Not a Slush Fund
UK grant assessors now expect a contingency line. A flat 10% is the standard. But you must explain what it covers. "Covers unforeseen equipment calibration delays" works. "Just in case" does not. Also consider inflation-adjusted software renewal costs or minor scope shifts after Year 1 evaluation.
Strong example: Contingency (10% = £48,250): Supplier delays on custom sensor calibration, minor scope adjustments per evaluation findings, inflation on Year 3-5 software licensing.
Indirect Costs: Know Your Rate, Negotiate Early
Your institution likely has a negotiated indirect cost rate (e.g., 40% of modified total direct costs). Apply it consistently. If the funder caps indirects at 15%, accept the restriction and note the gap in your budget notes. Never hide indirects inside direct cost lines - that triggers a compliance review.
Checklist for indirect costs:
- Confirm your current negotiated rate before writing.
- Check the funder's published policy on indirects (some ban them entirely).
- If indirects are disallowed, justify how you'll absorb overhead (e.g., in-kind from host organisation).
The Final Cross-Check: Numbers Must Match Exactly
Pull up three documents side by side: your narrative, your workplan, and your budget justification. Run through this list:
- FTE figures match between budget table and workplan (0.5 FTE is 0.5 FTE - not 0.45).
- Personnel names are spelled the same across all sections.
- Activity costs link to specific workplan phases (e.g., "Usability testing, Workplan Phase 2").
- Currency format is consistent (not mixing £ and $).
- All acronyms spelled out the first time they appear in the justification - especially funder names like UKRI, NIHR, AHRC.
- No floating totals - every line adds up to the grand total you've requested.
A single decimal-point mismatch trashes your credibility. Run the cross-check twice. Get a second pair of eyes. Then submit.
Draft the next application in GrantGunner
Create a free account, add your documents, and draft the form with your team. Create a free account