Second Call for Electric Power Generation Permits: New Window of Opportunity for Project Developers in Mexico

Listed on GrantGunner. Last checked 10 Nov 2026.

About this grant

Call from the Ministry of Energy (SENER) for new renewable electricity generation projects with capacity ≥0.7 MW, including battery storage requirements (30% capacity, minimum 3 hours) and commissioning between 2027 and the first half of 2030. The process is managed through the Single Window for Strategic Projects in the Energy Sector (VUPE), with expression of interest registration from May 13 to 22, 2026.

Who can apply

Individuals interested in developing new renewable electric energy generation projects with capacity equal to or greater than 0.7 MW, that interconnect to the National Electric System and align with binding planning. Distributed generation, self-consumption, cogeneration, joint development projects, and those associated with previously granted permits are excluded.

Browse all open grants

More grants from Ministry of Energy (SENER)